About us

About us

We handle everything from resin part design to mass production. With our in-house compounding and molding plants, we ensure fast delivery, consistent quality, and cost efficiency. Our 2023 compounding plant also produces high-grade materials like 60% glass-filled nylon.

CEO Message

At our company, we believe that true manufacturing is built on sincerity, trust, and craftsmanship.

Since our founding in Thailand, we have been committed to creating products that embody Japanese quality and local reliability.

By operating both a compound plant and a molding factory within the same organization,

we have established a production system that enables direct collaboration and synergy between material development and product manufacturing.

This integration allows us to respond quickly to customer needs while maintaining consistent quality and cost efficiency.

We are convinced that the synergy between compounding and molding creates new value beyond each individual process.

Our goal is to continue building trusted relationships with our customers,

and to contribute sincerely to the growth of manufacturing in Thailand and beyond.

Ryoji Ikari

Company

About us

Company Address

AITEC ASIA co.,ltd.
Siam IN Corporation Ltd.
Siam IN Compound Co.,Ltd.

Address

Room 402, Maison Esport, 862-2 Uranocho, Shimogyo-ku, Kyoto 600-8304, Japan

9/93 Moo5, Phaholyotin Road, Klong 1 Klong Luang, Patumthani 12120

62/38-40 Moo 3, Paholyotin Rd, Klong 1 Klongluang Pathumthani 12120

TEL

070-4793-7700
02-003-0413
02-038-3939

E-mail

ikari@siam-in.com
nareat@siam-in.com

History

沿革

2015.02

In the Kingdom of Thailand, SIAM IN CORPORATION LTD. was established with a capital contribution ratio of 49% from Itec Asia Co., Ltd. (Japan) and 51% from the Thai corporation. Mr. Ryoji Ikari was appointed as Managing Director.

2015.04

Factory interior completed; trial production started.

2015.05

Mass production system established; product supply to users commenced.

2016/08

Certified for ISO 9001:2015 and ISO 14001:2015

2023/10

Compounding plant started operation.